Outdoor Courtyard – Dahiyat Al-Haj Hassan
Overview
The building was inspected, revealing settlement in a specific corner. Following the inspection, the rehabilitation of the outdoor courtyard was carried out under the supervision of a specialized engineering team. The work included the removal of the old tiles, during which debris was found beneath the surface without proper ground foundations. Necessary engineering measures were implemented, including the construction of a bridge to connect and reinforce the main building. All procedures required to protect the building and ensure its structural safety were carried out, and the final finishes of the courtyard were executed to the highest standards of quality and precision.
Before Project Before Images
See the project state before work began